Since joists will be spaced on 16 or 24 inch centers 8 foot pieces of fascia work well.
Roof sheathing flush with fascia.
Flush soffit concealed fasteners.
Roof sheathing or decking is one of those elements.
The drip edge should be installed over a piece of 1 2 furring strip so that it stands off from the fascia or rafter tails.
If the drip edge is laid right up against the fascia or rafters then because of surface tension the water runs right up against the fascia and underneath the soffit.
Go back and check out photograph 10.
This soffit option will exceed your expectations when it comes to strength and aesthetics.
View flush soffit panel.
On the front of the roof edges the original roof deck sheathing was cut back flush with the wall and the fully adhered membrane folded down around the rafter tails to catch the wall water control layer and air control layer.
Draw a full scale mockup and snap a line with fascia in kind.
Osb is lightweight relatively inexpensive and strong enough to resist bending or breaking should someone walk on the roof.
The drip edge will be installed 1 8 proud of away or out from the furring strip in best practice or may be installed tight against the furring strip reduces the life of the furring strip by rot.
Nail thefurring strip to the fascia board near the fascia top tight under any extending of roof decking usually absent.
When sheathing a roof the first step is to snap a line so that the first row goes on straight.
In the u s roof sheathing is almost always composed of wood usually osb oriented strand board or plywood.
Step 2 hold your first piece in place starting flush at one corner with the top edge of the board pushed tight against the bottom edge of the roof deck or flush with the tops of the joists.
Run fascia the thickness of the plywood higher than the fly rafter on the gable and flush on the sub fascia.
This was then foamed to complete the air seal.
Chalk your line up the rake 48 from the point where fascia meets sub fascia.