Remove roofing and turn each sheet over.
Roof plate fixing.
If a roof has been re roofed with heavier roofing material than the original roof was engineered for.
At 7 05 paul begins replacing the drip edge roof flashing.
If fixing screws are left in the valleys your roof will leak in hundreds of places.
Cut a piece of 1 2 inch plywood that will cover the area.
If you can easily stick a screw driver into.
Damaged roof decking should be repaired by a professional but you can create a temporary solution by following these steps.
This should replace the strength of the original gusset plate.
The required pack comes supplied with the appropriate cleats and screws to penetrate through the timber top plate packer and into the top plate.
For typical roof trusses used in light frame construction bolts are usually not used because of spacing requirements.
Set out the ceiling joists onto the wall plates the ceiling joists are installed before the rafters as they will stop the roof spreading and also give something for you to lay planks across to stand on when building the roof.
Even when nails or structural screws are used spacing m ust be considered and the fasteners used at the repaired joint or member extend much further from the joint or crack than a metal connector plate.
You may need to use a putty knife to break the seam between the first course and the starter strip.
Use a flat pry bar to remove drip edge nails along the eave and rakes.
I e the original roof was a light wood shingle roof and the new replacement roof is a concrete tile roof weighing 5 or 10 times more than the original roof.
Slide the flat bar under starter course and pry out the nails.
Measure the damaged area between your roof rafters or trusses.
9kn and 16kn truss to top plate fixing used in pairs the cpc40 cleats achieve 9kn and the cpc80 cleats achieve 16kn.
To fix the joists and rafters down on to the wall plates they should be toe or skew nailed to the top plate like below.