L s 212 parapet termination 2 coping stone.
Roof edge termination.
Soprema counter flashings are manufactured in 12 foot lengths with pre punched notched holes for quicker installation.
The extruded aluminum resists rust and has eight bearing points to hold rubber in place.
Fold membrane back and apply bonding adhesive to the clean substrate and to the back of the membrane.
L s 221 mid parapet termination 1 reglet.
L s 203 roof edge termination 3 gravel stop or drainage bar.
Form a 1 2 minimum radius apply termination tape remove the release paper from the tape fold the rubber over the edge press the rubber firmly into the tape apply caulk to the back of a drip edge termination bar and screw the termination bars through the rubber and tape and into the spacer block.
Roofkit rubber roofing 10 foot aluminum termination bar is used for edge or vertical wall terminations.
File name size date.
L s 202 roof edge termination 2 gutter.
Allow to flash off.
Soprema counter flashing is designed to provide a watertight termination at the leading edge of the roofing material.
Position membrane to extend over roof edge and down vertical substrate to 1 below roof deck or nailer.
L s 211 parapet termination 1 cap flashing.
The 12 inch gravel stop sections were cut at random which allowed the tests.
L s 201 roof edge termination 1 edge system.
Roof edge termination of ballasted or mechanically attached roofing membrane systems.
Apply a 3 8 wide bead of waterstop 1 2 below roof deck or nailer.